Keysight
Office Fit-out
Keysight Technologies, the american multinational, needed an important actualization in its installations at Parque Tecnológico: reinstall completely their high tech laboraroty and create 5 conferences rooms. The contract included:
- Install 2 Daikin VRV, capacity systems with more than 60 kW
- Completely new electric installation, to increase the contracto from 60kW to 140kW of capacity.
- New systems UPS to protect the laboratory equipment.
- 12 kilometters of data wiring CAT6, with 160 data points.
- Audio / Video installation with projectors and TV, including wireless microphones.
- 60 x 60 cm LED panel from Simon.
- 5 new conferences room.
- New electric distribution board to control 140kW. Distribution board to laboratory with 140 kW of hired power, besides 9 circuits UPS for 340 kVA