Keysight (Office Fit-out 2015)

keysight logoKeysight Technologies, the American multinational, needed an important upgrade to their installations in the Technological Park to completely reinstall their high tech laboratory and create 5 conference rooms.

The brief included:
– Installation of 2 Daikin VRV systems of over 60 kW capacity
– Completely new electrical installation, to increase contract from 60 kW to 140 kW capacity
– Installation of new UPS systems to protect laboratory equipment
– 12 km of CAT6 data cabling, with 160 data points
– Audio/video installation with TV’s and projectors, including wireless microphones
– LED 60 x 60 cm panel lighting from Simon

5 New Conference Rooms

Meeting rooms

Before

Meeting rooms

During

Finished meeting rooms

After

New Electrical Distribution Board for 140 kW

During

During

After

After

Distribution board for laboratory with 140 kW contracted power, plus 9 UPS circuits for 340 kVA.

Uso de cookies

Este sitio web utiliza cookies para que usted tenga la mejor experiencia de usuario. Si continúa navegando está dando su consentimiento para la aceptación de las mencionadas cookies y la aceptación de nuestra política de cookies, pinche el enlace para mayor información.plugin cookies

ACEPTAR
Aviso de cookies